The experience of the Directorate of
Works in different fields of works in Iraq before
2003 can be shown in the summary below:
1. The construction of (218)
shelters.
2. The construction
of(3)hospitals. 
Construction of water supply
and sanitary networks, electrical power
stations, roads and air-conditioning networks,
such as:
1. Fix the air-conditioning
networks in many hospitals.
2. Construct the ice-making
factories in different locations of Iraq.
1. Construction of al –
Quadisia Airport.
2. Construction of al
–BakirAirport.
1. Developing
of the power stations and water supply projects
in many military camps.
2. Construct the sewage
treatment plant in Taji.
The
projects supervised by the directorate of works
throughout the ministry of housing and
construction to the benefit of (Ministry of
Defense in Iraq) after 2003.
Consisted the
renovation of multi-storey different buildings
(administrative, housing, services and health)
as well as the supervising to achieve the water
Supply, sewage treatment networks and electrical
power station with total Cost of
($15807354) and the supervising to construct two
stations of water supply and sewage treatment
plant with total cost of ($1356000).
-
Renovation of different
buildings with the necessary supported networks
in Al-Taji (stage 1, 2, 3, 4) including
the renovation of different administrative
housing , services and health buildings , as
well as the water supply and sewage treatment
networks and electrical power stations with
total cost of ( $71271000) .
|